Case Study: E-frank helps create legacy in Salford

case study image

2024

Legacie Developments Ltd enlisted E-Frank for a multifaceted project in Salford.

E-Frank has been subcontracted by the main contractors, Legacie Developments Ltd, to execute critical external works on a significant site in Manchester, Salford. This case study explores the challenges faced, the innovative solutions provided, and the comprehensive services delivered by E-Frank, leading to a successful project ahead of schedule.

The Challenge

Legacie Developments enlisted E-Frank for a multifaceted project involving the construction of a number of new apartments in Salford, Manchester. The scope of work included:

• Ducting
• Shuttering
Retaining Walls
Concreting
• Excavation & Reduce Level Dig
Installation of kerbs and pin kerbs
• Type 1 MOT
• Installation of tactiles
• Raising BT & manhole covers

These tasks required a high level of precision, adherence to strict timelines, and coordination among various teams to ensure seamless integration into the broader development project.

The Solution

E-Frank approached the project with a well-coordinated plan and a highly skilled workforce, certified with qualifications including SSSTS, CITB, First Aid, CPCS/NPORS, and SWQR. The team successfully completed ducting and concreting for the new substation. The works included:

Ducting: Installation of durable duct systems to house essential utilities.
Shuttering: Implementing temporary structures to mould concrete.
Retaining Walls: Strengthening the concrete with steel bars and mesh.
Concreting: Pouring and curing concrete to form the substation’s foundation.

In an impressive turnaround time of just seven days, the team completed the Section 278 works, which involved:

Excavation & Reduce Level Dig: Precise and safe removal of earth to prepare the site.
Kerb Installation: Placement of kerbs and pin kerbs for proper drainage and boundary delineation.
Type 1 MOT: Application of a sub-base layer to provide a stable foundation.
Tactiles: Installation of tactile paving for accessibility.
BT & Manhole Covers: Adjusting covers to the correct level for safety and functionality.

The Result

Thanks to meticulous planning and execution, E-Frank’s teams completed the tasks ahead of schedule, finishing the Section 278 works in just seven days and achieving overall progress two weeks ahead of the programme. This efficiency not only demonstrated E-Frank’s capability but also reinforced their commitment to excellence and client satisfaction.

E-Frank’s collaboration with Legacie Developments Ltd on the Manchester, Salford site exemplifies the skills of its workforce and unwavering commitment to project timelines. This partnership not only met but exceeded expectations, setting a benchmark for future projects.

Site Manager, Przemyslaw Wuwer has only positive words about E-Franks services “I have had a privilege of working with E-Frank on our project in Manchester during its final stage. They have provided quality work and they do not stop until the project is complete. Following a previous civil engineering company, they managed to transform the site from chaos to organised. I strongly recommend E-Frank’s services and I hope I will see them again on my next projects.